Project |
Year |
| 1 |
Sungai Selangor-Phase ll Stage l |
1996 |
| 2 |
Sri Gading Water Supply |
1997 |
| 3 |
Segama Water Project |
1998 |
| 4 |
Sempona Water Project |
1998 |
| 5 |
Sungai Selangor-Phase ll Stage ll (Job 1055) |
1998 |
| 6 |
Boh Plantation |
1998 |
| 7 |
Binh Ah Water Supply-Vietnam |
1998 |
| 8 |
Lahad Datu Water Supply |
1998 |
| 9 |
Selama-Perak |
1999 |
| 10 |
Sungai Long Project |
1999 |
| 11 |
Bekalan Air Simpang Jengka, Maran, Pahang. (Job 1047) |
2000 |
| 12 |
Bekalan Air Besut, Terengganu |
2000 |
| 13 |
Duriangkang Dam Water Supply Project, Batam, Indonesia. (Job 1104) |
2001 |
| 14 |
Loji Air Kota Lama Kiri Kuala Kangsar (Job 1069) |
2001 |
| 15 |
Sg Selangor Water Supply Scheme Phase 3 (SSP 3) (Job 1068/1101) |
2001 |
| 16 |
Matang Water Treatment Plant, Kuching, Sarawak. (Job 1059) |
2001 |
| 17 |
Muda River Water Supply Scheme Phase 4A, Sg.Dua Water Treatment Plant (Package 3) (Job 1090/1092/1098/1103) |
2002 |
| 18 |
Chincha Water Treatment Plant (Job 1072/1087) |
2002 |
| 19 |
Batu Kitang WATER TREATMENT PLANT, Sarawak (1108/1138) |
2003 |
| 20 |
Kulim Water Supply lll (Job 1114) |
2003 |
| 21 |
Sri Gading Water Supply Scheme, Stage 2 (Job 1102) |
2003 |
| 22 |
Refurbishment of Arau WATER TREATMENT PLANT, Phase lll (Job 1095/1100) |
2003 |
| 23 |
Sg.Trip Water Treatment Plant (Job 1053/1089) |
2003 |
| 24 |
Rancangan Bekalan Air Besut Terengganu (Job 1082/1091) |
2003 |
| 25 |
Nami Project, Kedah (Job 1094) |
2003 |
| 26 |
Bina/Pasang Logi/Kolam Takungan & Paip Air Utama Hilir Perak-Contract No.9 (Job 1077) |
2003 |
| 27 |
Lancang Treatment Works & Bulk Transfer-Package B (Job 1076/1107/1139) |
2003 |
| 28 |
Kepong ll Water Treatment Plant (Job 1095/1116) |
2003 |
| 29 |
Kuala Jalai Water Supply Project Phase (Job 1052/1092/1099) |
2003 |
| 30 |
New Labis, WATER TREATMENT PLANT (Job 1111) |
2003 |
| 31 |
Bukit Badong, Sungai Selangor (Job 1117) |
2003 |
| 32 |
Baling Water Supply (Job 1097/1115) |
2003 |
| 33 |
Semambu Water Treatment Plant, Kuantan (Job 1129) |
2004 |
| 34 |
Merbau Chondong Water Treatment Plant, Kelantan (Job 1119/1128) |
2004 |
| 35 |
Sg.Tong WATER TREATMENT PLANT,Terengganu (Job 1122/1131) |
2004 |
| 36 |
Greater Ipoh Water Supply Scheme ll The Construction of Sg.Kinta Water Treatement Plant & Associated Works. (Job 1134/1155) |
2005 |
| 37 |
Gurun Water Treatment Plant (Job 1123) |
2005 |
| 38 |
Construction of Water Treatment Plant at Kogopon, Papar, Sabah (Job 1154) |
2006 |
| 39 |
New Water Treatment Plant Project, Sg.Cherol, Terengganu (Job 1178) |
2006 |
| 40 |
Projek Pembinaan Loji/Kolam Takungan & Paip Utama Telibong & Telipok, Sabah |
2006 |
| 41 |
Kg.Puteh WATER TREATMENT PLANT, Kota Bahru, Kelantan (Job 1121/1153) |
2006 |
| 42 |
Salim Water Treatment Plant, Sarawak (Job 1176) |
2007 |
| 43 |
Brunei-New Sg.Liang Water Supply Project Phase lV (Job 1159) |
2007 |
| 44 |
Kudat WATER TREATMENT PLANT, Sabah (Job 1152) |
2007 |
| 45 |
Sandakan WATER TREATMENT PLANT,Sabah (Job 1151) |
2007 |
| 46 |
Kunak Water Supply (Job 1191) |
2008 |
| 47 |
Batticaloa, Sri Lanka- Water Supply Scheme (Job 1196) |
2008 |
| 48 |
Bekalan Air Arau (Job 1160/1195) |
2008 |
| 49 |
Lubuk Buntar WATER TREATMENT PLANT-Bekalan Air Bandar Baharu (Job 1189) |
2008 |
| 50 |
Hambantato Water Supply Project, Sri Lanka (Job 1187) |
2008 |
| 51 |
Turusan Water Treatment Plant (Job 1200) |
2009 |
| 52 |
Jeniang Water Treatment Plant, Kedah. (Job 1219/1234) |
2009 |
| 53 |
Trong Water Treatment Plant, Kedah. ( Job 1213) |
2009 |
| 54 |
LWS (Fasa ll) Beaufort Water Treatment Plant (Job 1204) |
2009 |
| 55 |
Membaikpulih & Menaiktaraf Loji-loji Tangki Air Negeri Kelantan (Job 1201) |
2009 |
| 56 |
Sg.Labu Water Treatment Plant (Job 1242/1254) |
2010 |
| 57 |
Temerloh Water Treatment Plant (Job 1230) |
2010 |
| 58 |
Pintu Geng WATER TREATMENT PLANT (Job 1260/1270/1313) |
2011 |
| 59 |
Sg Dua WATER TREATMENT PLANT, SPU (Job 1297) |
2012 |
| 60 |
Trusan WATER TREATMENT PLANT (Job 1312) |
2012 |
| 61 |
WATER TREATMENT PLANT at Sg.Palai Kampar (Job 1317)-Phase 1 (Job 1324) |
2012 |
| 62 |
Saratok Regional Water Supply-Phase 1 (Job 1324) |
2012 |
| 63 |
SOGIP Water Supply Project Sipitang (Job 1342) |
2013 |
| 64 |
Cadangan Menaiktaraf & Peningkatan Loji Rawatan Air Jempol Bahau (Job 1332/1346) |
2013 |
| 65 |
Refurbishment of Filter Plant in Bukit Toh Allang WATER TREATMENT PLANT (Job 1337) |
2013 |
| 66 |
Solano, Nueva Vizcaya, Philipines (Job 1417 & 1430) |
2014 |
| 67 |
Sipitang Water Treatment (Job 1411) |
2014 |
| 68 |
Bekalan Air Keningau, Sarawak (Job 1206) |
2014 |
| 69 |
Kalu Ganga Water Supply Project, Sri Lanka-Phase 1 Stage ll (Job 1401) |
2014 |
| 70 |
SSP2- Bukit Badong (Job 1429 & 1430) |
2015 |
| 71 |
Package 2A- Construction & Completion of 1130 MLD Langat Water Treatment Plant (Job 1427) |
2015 |
| 72 |
Ganchong Water Treatment Plant 3, Pahang |
2016 |
| 73 |
Package 16B: Provision of Basic and Detailed Engineering, Procurement, Construction & Commissioning of Rapid Raw Water Treatment Plant for Rapid Project at Pengerang, Johor |
2016 |
| 74 |
Kelani Right Bank Water Treatment Plant, Sri Lanka, Job 1202/1203) |
2009-2010 |